A (Silly) Video Tour of the Finca

We often have people visit who are curious about what we’ve been up to, so we thought it would be fun to do a little silly video tour for those of you who can’t visit in real life. We had fun making it, and we hope you like it. We should probably do a video like this every year to see all the progress we make. We’ll see about that.

IMG_2911

 

 

What do you think of this post?
  • WOW (1)
  • Awesome (13)
  • Interesting (0)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

Roof Paneling is On

Work on the roof has been slow and steady. For just three guys to basically build this entire house (plus me, when I can) it’s a pretty amazing feat. For these roof panels, Britton and I spent about 2 full days painting them. The grooves were super difficult to paint and we needed to use 10 gallons of paint plus 5 gallons of primer (thanks John and Fran!).

Painting panels
Painting during the heat wave we had last week: The Saraha not only brought us its dust, but also heat!

Once they were painted the guys brought the panels down to the staging area and then carried them by hand the rest of the way there.

Waving the flag
Puerto Rican Parade? Nope, just bringing materials down

The pitch of the roof is fairly steep, so once the panels were over there, Waldemar took the lead on the top since he had the most experience  (and least fear of heights).

Putting up roofing panels
The amazing Waldemar in action!

As the roof became covered it is starting looking more and more like a complete house.

Back of cabin

Some of the panels got scuffed up in the process of sliding them around and some of the grooves still need touched up with paint, but overall, it is looking really good and the high ceilings make it feel more spacious than it is.

They finished placing all the underside paneling as well as tar-paper. Next week will be the purlins and the actual metal roofing. In the meantime, the finca has been exploding with growth. I will have to post more pictures from the gardens, but here’s a start. Lots of cool stuff going on lately.

Double hibiscus
Double hibiscus bloom

What do you think of this post?
  • WOW (3)
  • Awesome (5)
  • Interesting (0)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

The Roof is Framed!

Poco a poco we are getting through some of these tough spots in the cabin-building.

Scaffolding
Scaffolding in the air – or Andamio in Spanish

This week the guys built some pretty high scaffolding for the roofing job as well as finished framing all the walls.

Building walls
Framing and working with the scaffolding

Turkey and Britton working on the cabin
Turkey boss checking over the work

Everything was moving along really well. They brought over each of the ceiling beams and began to set them into place. Meanwhile, we got all the T1-11 for the underside of the roof/ceiling. The plan, as you may remember, was to just put it up. However, when it arrived, it was clear that it would need something done to it because there was spray paint on it from the lumberyard as well as obvious putty wood filling. This meant we needed to paint it. Britton and I thought it would be best if he and I worked on the painting while the guys finished setting the beams. We worked the whole morning into the early afternoon on these things. But we only got about 9 out of 32 done. The T1-11 is really hard to paint, especially in the grooves.

Painting panels
Painted versus not

This also meant that we had left the guys unattended setting the beams. What could go wrong with that? Well, when Britton went over to check on them, they were nearly done setting them. But they said we were short about 10 boards. What? We knew we had more than enough. Well, sure enough they had set them 16 on center…instead of 24. Oh no! We thought about just leaving them as they were and buying and painting more beams, but this would be a more costly error to allow than to just undo and redo. Man! I swear these beams are going to drive me nuts.

Side house
Beams on at 16 inches on center -woops

So we spent the next morning fixing them and it went pretty quickly really but all the pulling of the nails and such left the beams a little less than perfect. Oh well. Moving on.

House with roof framed
Roof re-done- starting to look like a house!

We still need to finish painting all the rest of the paneling before we can set them on the roof, so they began bringing over the wall side panels first. We drove them down to the halfway point and they carried them on their back like turtles to the site.

Carrying materials through the forest
Everything at the site was hand-carried /moved there!

I try and do what I can on this project such as painting, helping find materials, translation/interpreting, mathematics.calculations, drawings, budgeting, design decisions, and of course documenting it, but most of the work and pretty much all of the heavy lifting is done by just these three guys: Britton, Waldemar and Jorge. And even though they may make mistakes (don’t we all!), we are so glad to have their help.

Today my job was housekeeping! Keeping a construction job site tidy is not an easy task!

Cassie Sweeping
Sometimes I am called la jefa (the boss lady), and sometimes I am the cleaning lady. We all do what we can and needs to be done

Progress on a big project like this goes in spurts. We have to be flexible and duck and dodge and not be too much of a perfectionist. Overall, things are going really well and I think we are just about to the mid-point where the big items are done (next big one after the roof will be the deck/stairs) and then we can go on to the more fun things like finish-work. Onward and upward! Hooray. The roof is framed!

What do you think of this post?
  • WOW (1)
  • Awesome (3)
  • Interesting (1)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

Ceiling Beams: A Comedy of Errors

Not all aspects of this building project have come easily. Some have been a comical disaster.
It’s nothing that we can’t change or fix, but big time and money wasters. Case in point: these dang ceiling beams.

We determined a while ago to have exposed ceiling/roof beams with a siding underneath. I researched and found quite a few different styles. For instance, something like this:

home-design
Example of an exposed wood beam ceiling

So Britton and I began by first powerwashing and then sanding the beams. We picked out a wood stain at Home Depot called Oak Leaf by Lanco. We thought it would be a deep wood color and then we could use a lighter stain on the T111 underneath.

Lanco stain
This is the exact stain we chose: buyer beware!!!

When Britton began staining, we noticed that the color was quite a bit redder than we expected. However, we thought maybe it was just because it was still wet and would mellow with time.

Stain
Beginning to stain -the start of the laughable nightmare

Hmmm…. the color threw me off a little because I wasn’t sure if a golden color would go well with the wine red. We thought about it a while and Britton agreed. Well, how about white underneath instead? We decided we would change to painting the T111 white to better go with the unexpected color of the boards. That was the first plan adjustment.

Well, when Britton came back from his trip to Colorado, we checked on the boards hoping they would be mellowed out and found the opposite. They were completely unacceptable. They were all different shades of red from an orange-red to a bright purple. Some of them didn’t even accept the stain and others soaked in too much. It was just a mess!

really red boards
Check out the wild range of RED boards

So we started talking about what could be done about them. Stain is stain…literally and is virtually impossible to remove completely unless you plane it down. By now Britton has already spent probably 12 -15 hours sanding and staining these things.

We got to talking and our friends Dan and Theresa recently just moved into a wooden house in Rincón and invited us to check out how the roof/ceiling was done in it.

roof idea dan and theresa
Another roof idea we liked -and it was here in PR!

We thought this could work! We would find a solid stain or paint for the beams and then a semi-transparent one for the T111. We went to Home Depot again and took back the white paint we were planning on using and asked the clerks what they recommended. They gave us a brochure and we looked through it for the better part of an hour until we found what we wanted. We went to pick it out and…oh, yah they don’t have that here in Puerto Rico. Only in the states! Oh, ok, well that would have been nice to know beforehand…

So the next day we saw that the Sherwin-Williams store in Rincón was having a sale. Perhaps they would carry a line of semi-transparent. They did! We were super excited. We picked out a tannish color for the beams and a matching semi-transparent for the panels along with primer to cover the red stain. One of the associates insisted on bringing it to our truck, but because of his short stature couldn’t quite reach over the truck bed with the paint and he dropped it with a thud. Oops. It didn’t look like anything had happened. But come to find out that when it had been dropped, the can bent and began spilling in the cardboard box, so when BK picked it up it just splattered everywhere! All over the truck, all over his clothes (our rarely worn ‘in-town’ clothes no less) and all over the rest of the paint supplies. We went back to the store and they apologized and refilled the gallon of stain.

spill of stain on britton IMG_2688
Stain spilled everywhere!

So that day was shot. But we wanted to get these things done before the guys came back to work on the roof. We frantically primered and then painted over all the 38 beams. This took another 12 hours or so over the course of two days.

When they were complete, we were happy with the color and our newest adjustment to the plan.

IMG_2699
Freshly painted roof/ceiling boards

Then we went to begin the staining of the T111 and found that the color did not match really at all. It was quite a bit darker and not really even in the same color shade. Why didn’t we check that BEFORE we started painting the beams? AGH! So frustrating. What is up with these stains?! Maybe we are going crazy. Or maybe we should stick with what we know: paint. Of course this is all just cosmetic and we shouldn’t worry too much but these darn beams have taken so much of our time, money and contemplation that we are just burned out!

At this point we have decided to just keep pushing through with the roof and install the underside T111 without anything on them for now. Sometimes I wonder if we would have been better off doing nothing to these beams than all of this running around. Talk about spinning our wheels! I guess this is how you can tell we are amateurs (or fools?). We thought we were being efficient by working on these beams on the ground, but maybe we should have just waited until the finishing stages. These are the painfully hilarious lessons in a big project like this. My mantra lately: Mistakes are just learning opportunities. Mistakes. Are. Just. Learning. Opportunities! I also try and constantly remind myself not to sweat the small stuff (and it’s all small stuff). That relative to the issues other people are dealing with this is just child’s play. But sometimes I feel like a big bumbler out here.