Category Archives: Building

Construction Jargon and Batter Boards

In addition to the Puerto Rican Spanish I am learning, I am also learning Construction Spanish AND English vocabulary! 🙂 I am learning all about rebar (varilla) and these things called aros (not sure in English what these little squares of rebar are called) and all the varieties of sand (arena and arenon), concrete (concreto, hormigon, concrelisto), lumber (madera, palos), sizes and types of nails (clavos galvinizados o de acero), sweet wire? (alambre dulce) saws (sierras), hammers (martillos) and sledgehammers (marrón o majón depending on the person), pickaxes (picotas), cutting shovel and others (pala de corte y otras palas) hoses (manga o manguera) etc.

This is because we spend a lot of our time in hardware stores (ferreterías) and with the guys that work with us on our projects. Our most recent step in the cabin project has been batter boards (Spanglish: bater bors). I had never even heard this term in English, but apparently it is essential to assure a square and level structure. That would have been nice to know when we built the chicken/turkey coops, but instead we have very “custom” coops, haha (hey, they ARE level at least!).

Site
The cleared site

Britton (and sometimes I) worked every day for a couple of weeks cutting and clearing the space. It was hard, hot work! The site was finally deemed ready and cleared of enough trees and brush that they could start building the batter boards. So the first step in the batter boards is to set about measuring.

Measuring
Measurements

The next step is to build a wooden frame around the actual footprint of the structure that is level and squared. And finally, it is to drop the plumb bob (plomada) to determine exactly where to place the columns.

Building on a slope, we knew we would need poles/columns for a foundation because excavation and a slab foundation wouldn’t be feasible in this remote location. We even figured that we wouldn’t probably be able to use the poles from the wood house because they would be too short. What we didn’t figure was just how steep the slope was. We have learned that anything with walkable land in Puerto Rico is not considered steep. People often remark at how “flat” our land is. Flat is relative. On the plains of Colorado, we know flat. Flat as a fricken pancake. Here, though flat just means you can walk it without slipping over a cliff. So even though this site was “flat” by Puerto Rico standards, the batter boards don’t lie. Our front columns will be 8-10 feet high and the deck even more.

Height
Way above my head  

Batter boards
And Britton’s too!

Site with batter boards
Batter boards, complete!

Next up, diggin’ holes in rocky soil under a hot sun for the columns. I am sure the vocabulary for THAT will be quite enlightening! 🙂

What do you think of this post?
  • WOW (2)
  • Awesome (1)
  • Interesting (1)
  • Useful (2)
  • Bummer (0)
  • Whoa (0)

Preparing the Site

We are in the early stages of cabin-building. The first step is to prepare the site.

Cabin Site
Cabin site before clearing: So many trees and brush!

This means finding and improving trails to the site as well as clearing trees and brush where it will be located. The guys also brought over the huge girders (from the old wooden house). This was quite the task as they are very heavy and long (30 feet).

Huge Board
Long, heavy girders. Not so hard going down the hill but uphill is a different story

Site Clearing
Cleared quite a lot already

Exciting stuff is underway!

What do you think of this post?
  • WOW (0)
  • Awesome (6)
  • Interesting (1)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

Are We Hillbillies or What?

We are nearing the very end of the house demolition project. However, now that the house is basically just pieces of wood on the ground, everything else about our life is totally disordered. That’s what happens when you live “on-site,” I suppose.

Working in Paradise

Thursday was the craziest with activity and lots of hammer drilling from about 7am to 7pm, so Friday we needed a break (and I think the workers did too)!

But it wasn’t a true break, because I still needed to get laundry done amidst all the chaos that was left behind. I was getting a bit snippy with Britton about my “less than ideal” ability to wash and hang laundry and he stopped me in my tracks and said, “Wait, I need to get a photo of this.” Yep, it is pretty hilarious. And a good reminder to not take things too seriously. Everything will get sorted out….eventually! And if we turn into hillbillies in the process, so be it!

Crazy laundry and turkeys
Crazy acres is the life for me! 🙂

The cool thing about living amidst all the construction progress is that you get to know everyone pretty well. Well enough that when the guys heard that I had never had “pitorro” (which they pronounced pitojo), the next day they brought a bottle of it for us and a bottle for them and we all took shots (a very small one for me) from the same metal cup and said “salud!” Pitorro is like Puerto Rican moonshine and everyone has a different recipe for it. This one tasted pretty good and sweet and was made with tamarind and parcha juice, but it did pack a punch. An only in Puerto Rico experience for sure.

PitorroYou can’t be a true hillbilly until you’re drinking the local moonshine, right? 🙂

What do you think of this post?
  • WOW (2)
  • Awesome (7)
  • Interesting (0)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

House is Nearly Gone and New Electric Project

Life has been pretty hectic around here lately. We are used to a pretty mellow and peaceful pace, but lately we have had crews of people in and around the property from sun up until sometimes past dark. While Britton and I are not doing very much of the labor ourselves (a major difference as well!), it is still pretty chaotic and stressful to have everything around you totally disrupted and noisy. Still,  things must get messy before they get pretty; it is how progress gets made after all. And we are very thankful for all the help we have had in moving towards these goals.

Missing house
Not much left!

The house is nearly gone. They are down to just the very last few beams and posts and a little clean up work. We plan to keep the lower shed room as a storage space and laundry room for the time being, but otherwise, everything will be gone super soon. It is so weird how much it is already transforming this space.

Ugly old electric line

The next thing we had to consider was the electrical line that runs from the wood house to our cabana. If we were to leave it, it would just be a pole sticking up connected to the street pole that traversed from the house through a tube under ground to the cabana. In order to take down the rest of the house, we need to remove it as well and have an electrical pedestal installed that connects directly to the cabana. We talked with an electrician who happens to be the father of one of the workers and he said he would be able to fix it. So in addition to our house demolition team hammering and tossing boards, we also had the electrical team digging trenches and sawing into our little concrete cabana. Talk about chaos!

Drilling into the house
Dust flying as the house was being sawed to the breaker box

The pedestal will be installed near the gate and will be very close to the road electrical line thereby removing the line that shoots downward where the house once stood.

work site and Pedestal from the road

After the house is down, the wood is stacked and protected from the rain, the shed is finished and the electrical system is rigged up, I think Britton and I are ready for a bit of a Christmas break! Whew!

What do you think of this post?
  • WOW (3)
  • Awesome (1)
  • Interesting (3)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)