Windows, Bridge Work and Fun

The month of September was sort of a waiting month. In order to put on the siding (we found chanfles instead of T-111) we needed the windows. But the windows were supposed to take about 4 weeks to finish. So in the meantime, we had started on the footbridge. But our friend Walde could only work weekends. Basically we had a lot of mini-fires going just waiting to get bigger. We still always have plenty to do, however, and yard maintenance is pretty much front and center this time of year.

BK in the gardens
Britton and the turkeys under the large avocado tree in the “garden area”

But now the windows are here! It actually took a little less time than they estimated. Windows are a different sort of bird in Puerto Rico than in the states. In the states there are generally egress rules whereby you must be able to escape out of the windows in case of a fire or other emergency.

Here, that must not be the case, because it is very difficult to find any window that you could climb through. The vast majority of windows are Miami shutter style which works for ventilation, but they block out the view. Or you can get a picture window, but they can’t open. Well, we wanted good airflow as well as visibility, so we went with larger clear glass louvres. A good compromise I think given the options.

Windows
When the windows arrived we loaded them into the truck and then brought them to the cabin

The other difference with windows is that they are almost always custom made by an aluminum works type place. We learned that trick when we got our screen doors for the cabana. They are usually cheaper than what you can find in a big box store (like Home Depot) and they will fit perfectly! Plus it helps out local businesses.

Installing window
Britton installing windows at the cabin

The bridge is the other big project that is moving right along. Since Britton only has Waldemar’s help one or two days a week, we made a big decision to get a cement mixer. To ligar cemento we would need to hire at least 2 other guys for at least 3-4 days to fill in the zapatones and the mini-columns, so we figured that even with this job it will pay off and then we can make cement stuff all over the property all by ourselves.

Bridge footers
Britton and la máquina

We’ve decided to name this bridge Tito. You know, for Tito Puente! 🙂 Here’s one of our favorite songs of his (though most will know it as a Santana song).

We are becoming pretty good friends with these guys that have been helping us on various projects and planning lots of paseos with them. On Saturdays after the work is through, Papo comes over with a bunch of food and we set up a little mini-bar and tail-gate from it. We listen to bachata from his truck with the doors open, open up some coconuts and drink coconut water with whiskey and eat pollo, yuca, arroz con gandules and dance a little in the middle of the yard. Life is fun. We’re getting stuff done, but we’re enjoying it along the way.

Hanging out after working
Fun with friends

What do you think of this post?
  • WOW (4)
  • Awesome (8)
  • Interesting (0)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

Cabin Walls and Pozo

We are at the phase of the cabin project where we can really see the shape that the house is taking. This week we began framing the walls and digging the “pozo.” Pozo means well, but in this case, it is the word they use for septic tank. This hole has to be at least 6 feet in the ground, 6 feet wide and 6 feet in length. Below about 2 feet, it is rock hard soil. And they are digging by hand. In the full sun. Yah. There are some worn out guys by the end of the day.

Digging the septic hole
Britton and the guys take turns digging and removing the dirt for the septic

Before we even started these tasks, Britton installed all the hurricane clips beneath the house as well as brought over and powerwashed nearly all of the 2x4s. Between him and me, I think we probably washed about 200 pieces of wood, and some of them really needed it.

Powewashing boards in the quebrada
Britton pauses during powerwashing (sorry it’s a little blurry)

This is such a major project it quickly becomes exhausting. The guys often work straight through in the hot, blazing sun. Since we had to clear the area before we could build, it is just roasting without shade. The good thing is that we think it is going to be an excellent candidate for solar power.

Framing
Framing the first wall

Every single thing that you see in these pictures was brought over by hand through the jungle up and down slick slopes under and over trees and vines. I don’t think anyone would deny that we really are a team of go-getters with can-do attitudes (but they may say we are a little crazy too  🙂 )!

Walls up
Two walls up

We are still deciding on a few things like siding (there is really only one choice at any ferreteria: T-111 siding -but we would prefer something else, windows -Miami shutters (Air Masters) must make up 90% of the market here so again not much choice in the matter unfortunately, and we can’t find any rolls of insulation anywhere. Not that we really need insulation for temperature reasons (there will be no heating or air conditioning inside) but we would like it in order to fill the cavities so that bees or bats won’t want to once again take up residence inside. These are fairly minor issues, they just make our days “off” seem like endless scavenger hunts with promising leads, but all trails point to the same limited choices (anyone with any suggestions?). Cést la vie in Island Construction.

What do you think of this post?
  • WOW (3)
  • Awesome (2)
  • Interesting (1)
  • Useful (0)
  • Bummer (0)
  • Whoa (2)