The next phase to the bridge was to put on the 2×8 rail boards. Once these boards were placed we were able to start finding 2x4s that would work for the planks. Most of this whole bridge was built using scrap lumber that we still have around from the old wooden house. We used up nearly all of the 2x6s on the deck and roofing for the house, but we still have LOTS of other sizes and types of wood. So it is nice to be able to clear out some more to use on this bridge.
Looking down the line of the bridge -ready for the decking planks
Cabin and bridge through the trees
Lately it has been raining pretty heavy so there has been a light stream flowing under the bridge. It has also made the slopes really slippery. A good reminder why we decided to build this bridge in the first place.
Future 75 foot long foot bridge over an intermittent creek (the quebrada)
It’s really starting to look like a bridge now!
In other news, check out this gorgeous canna. These flowers are always in bloom and spread like crazy. One of my favorite tropical bulbs/flowers. Even their foliage is beautiful.