Windows, Bridge Work and Fun

The month of September was sort of a waiting month. In order to put on the siding (we found chanfles instead of T-111) we needed the windows. But the windows were supposed to take about 4 weeks to finish. So in the meantime, we had started on the footbridge. But our friend Walde could only work weekends. Basically we had a lot of mini-fires going just waiting to get bigger. We still always have plenty to do, however, and yard maintenance is pretty much front and center this time of year.

BK in the gardens
Britton and the turkeys under the large avocado tree in the “garden area”

But now the windows are here! It actually took a little less time than they estimated. Windows are a different sort of bird in Puerto Rico than in the states. In the states there are generally egress rules whereby you must be able to escape out of the windows in case of a fire or other emergency.

Here, that must not be the case, because it is very difficult to find any window that you could climb through. The vast majority of windows are Miami shutter style which works for ventilation, but they block out the view. Or you can get a picture window, but they can’t open. Well, we wanted good airflow as well as visibility, so we went with larger clear glass louvres. A good compromise I think given the options.

Windows
When the windows arrived we loaded them into the truck and then brought them to the cabin

The other difference with windows is that they are almost always custom made by an aluminum works type place. We learned that trick when we got our screen doors for the cabana. They are usually cheaper than what you can find in a big box store (like Home Depot) and they will fit perfectly! Plus it helps out local businesses.

Installing window
Britton installing windows at the cabin

The bridge is the other big project that is moving right along. Since Britton only has Waldemar’s help one or two days a week, we made a big decision to get a cement mixer. To ligar cemento we would need to hire at least 2 other guys for at least 3-4 days to fill in the zapatones and the mini-columns, so we figured that even with this job it will pay off and then we can make cement stuff all over the property all by ourselves.

Bridge footers
Britton and la máquina

We’ve decided to name this bridge Tito. You know, for Tito Puente! 🙂 Here’s one of our favorite songs of his (though most will know it as a Santana song).

We are becoming pretty good friends with these guys that have been helping us on various projects and planning lots of paseos with them. On Saturdays after the work is through, Papo comes over with a bunch of food and we set up a little mini-bar and tail-gate from it. We listen to bachata from his truck with the doors open, open up some coconuts and drink coconut water with whiskey and eat pollo, yuca, arroz con gandules and dance a little in the middle of the yard. Life is fun. We’re getting stuff done, but we’re enjoying it along the way.

Hanging out after working
Fun with friends

What do you think of this post?
  • WOW (4)
  • Awesome (8)
  • Interesting (0)
  • Useful (0)
  • Bummer (0)
  • Whoa (0)

2 thoughts on “Windows, Bridge Work and Fun

  1. Maria

    So glad that your house is coming along so well. I love the name of the puente- Tito for Tito Puente- very cool.

    That is the Puerto Rican way– good food ,good music and good friends =Good times.

    Tonie

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *